Budget Systems
5kW Budget Handtruck
Portable 5 kWh, 120V output, builds in 25 minutes ~$2,020
10kW Budget Handtruck
Portable 10 kWh, 10 kW output ~$3,593
12kW Budget System
Whole-home backup. 12 kW inverter, 32 kWh battery from ~$4,750
System Builders
Offgrid System Builder
Whole-house off-grid, 5–12 kW From $5,400
Hybrid System Builder
Permitted grid-tied build, scales to 36 kW ~$13,500
Pre-Wired
Pre-Wired System
EG4 XR 60. One cabinet, 60 kWh ~$20,499
Mobile, 12V, tight on space and weight
Marine-rated, waterproof, heated cells
Small off-grid build, 12V or 48V
Off-grid or grid-tied with backup
10kW to 12kW inverter with a 32kWh battery. From ~$4,750
How to build a whole-home backup system from one 10kW to 12kW all-in-one inverter and a 32kWh battery.
Follow the five steps in order. You build the system, and an electrician makes the final connection to your panel.
The trade-offs. This is the lowest-cost way to back up a whole home, and it gives up three things to get there. The equipment is indoor only (the SUNON12 and EG4 12000XP are rated IP20). The system is not UL 9540 listed and the Yixiang battery is not UL listed, so some inspectors and insurance companies will not accept it. And every part is separate, so you run battery cables, AC wire and PV wire between them. My EG4 hybrid build fixes all three: outdoor-rated inverter and batteries, UL 9540 listed equipment, and less wiring.
Affiliate links below
Step 01: pick the inverter. Step 02: get the battery. Step 03: choose how it connects to your panel. Step 04: gather the cable and tools. Step 05: build it, one card at a time.
Also on this page: cost, meter collar transfer switches, shopping checklist, inverter settings and troubleshooting.
Everything stays off until the last card.
| Part | RUiXU SUNON12 build | Powland 12kW build | EG4 12000XP build | SUNGOLDPOWER 10kW build |
|---|---|---|---|---|
| Inverter | $2,099 | $1,050 | $2,100 | $1,422 |
| Yixiang 32kWh battery | $3,699 | $3,699 | $3,699 | $3,699 |
| Total | $5,798 | $4,749 | $5,799 | $5,121 |
| GenerLink 30A meter collar (Option C only) | $1,245 | $1,245 | $1,245 | $1,245 |
| Total with meter collar | $7,043 | $5,994 | $7,044 | $6,366 |
Prices checked November 2026. They change, so use the buttons below for the current price. The 40A GenerLink is $1,280. Battery cable, tools, solar panels and the electrician are extra.
Pick one all-in-one. The inverter, the solar charge controller and the battery charger are in the same box, so there is nothing to wire between them. All four run 120/240V split phase from a 48V battery. Three are 12kW. The SUNGOLDPOWER is 10kW, so it fits homes whose loads stay under 10,000W.
The build cards and graphics below show the RUiXU SUNON12. The others connect the same way, but their terminal layout and menus are different, so follow their manuals for those parts.
| RUiXU SUNON12 | Powland 12kW LOWEST PRICE | EG4 12000XP | SUNGOLDPOWER 10kW | |
|---|---|---|---|---|
| Price | $2,099 | $1,050 | $2,100 | $1,422 |
| Output | 12,000W | 12,000W | 12,000W | 10,000W |
| Solar input | 24,000W | 12,000W | 24,000W | 11,000W |
| MPPT range | 90 to 450V | 90 to 500V | 120 to 385V | 125 to 425V |
| Max PV voltage | 500V | 500V | 480V | 500V |
| Battery charging | 250A | 200A solar, 63A AC | 250A | 200A |
| Generator input | Yes, separate | Shares the grid input | Yes, separate | Shares the grid input |
12kW with 24,000W of solar input and a separate generator input. The inverter shown in every graphic on this page.
12kW with 12,000W of solar input. The lowest price of the four.
12kW with 24,000W of solar input, a separate generator input and 100A grid bypass.
10kW with 11,000W of solar input and 20,000W peak. Use it if your loads stay under 10,000W.
One battery: the Yixiang 32kWh. It weighs about 600 lb. Without a forklift you cannot move it, so build it in the spot where it will stay. Its JK 300A BMS covers a 12kW inverter at full output, which pulls about 250A from the battery.
32kWh, 51.2V, JK 300A BMS. About 600 lb, so build it in place.
To estimate runtime, divide 32kWh by your average load in kW.
The inverter makes the power. An electrician connects it to your house wiring. There are three ways to do it, and all three use the same inverter and battery. Pick one before you order parts.
Option A
Whole house with a transfer switch. The switch sits between your meter and your main panel. Flip it and every circuit in the house runs from the inverter. You manage the load: the inverter tops out at 12,000W (50A per leg at 240V), or 10,000W on the SUNGOLDPOWER, so the range, dryer, EV charger and central AC stay off while you are on the inverter.
Option B
Critical loads panel. A two-pole breaker in your main panel feeds the inverter, and the inverter feeds a second panel that holds the circuits you pick. Your electrician sizes that breaker and its wire. Grid power passes through until an outage, then the battery takes over on its own. The big loads stay on the main panel.
Option C
Whole house with a meter collar. A meter collar is a transfer switch that goes between your utility meter and the meter socket, so nothing changes inside your panel. Your utility has to approve it and install it. Plug the inverter into it and the whole panel runs from the inverter. Collars top out at 30A or 40A (7,200W or 9,600W), so shed the big loads first. See Meter Collar Transfer Switches below for how to set one up and what they cost.
A meter collar is a transfer switch that plugs in between your utility meter and the meter socket. It moves the whole panel to backup power without any work inside the panel, which makes it the quickest of the three options to set up. Your utility has to approve it and install it, because the meter belongs to them.
What they cost on Amazon
| Model | Rating | Most it passes from a 12kW inverter | Price |
|---|---|---|---|
| GenerLink with surge protection | 30A, 240V | 7,200W | $1,245 |
| GenerLink non-surge | 40A, 240V | 9,600W | $1,280 |
Prices checked November 2026. Both kits come with a 20 ft cord. The collar’s 30A or 40A rating, not the 12kW inverter, sets how much power reaches your panel, so keep the house under it.
How to use one with this system
Meter collar transfer switch. Passes up to 7,200W. Built-in surge protection, 20 ft cord.
Meter collar transfer switch. Passes up to 9,600W. No surge protection, 20 ft cord.
Battery cables: the SUNON12 manual calls for 2/0 AWG copper up to 12 ft and 4/0 AWG from 12 to 20 ft. At full output a 12kW inverter pulls about 250A from the battery. Keep the cables short and make the red and black the same length.
From the hardware store or your electrician: copper wire for the AC side, a two-pole breaker that fits your panel, and the transfer switch, critical loads panel or meter collar outlet. Your electrician sizes the wire and the breaker. The SUNON12 manual lists 2/0 AWG for the grid terminals and 3 AWG for the load terminals.
Wire, lugs and heat shrink for the two cables between the battery and the inverter
Cuts 2/0 battery cable square. Also cuts the AC wire
Strips the 2/0 battery cable without cutting strands
Battery powered hydraulic crimper for the 2/0 lugs
Manual, lower cost way to crimp the 2/0 lugs. Slower, same result
Seals each lug after you crimp it
Shrinks the heat shrink on the battery cable lugs
Tightens the battery and inverter studs to the torque in their manuals (79.7 lb-in on the SUNON12)
Tightens the AC and PV screw terminals to spec
Strips the smaller AC wire and the 10 AWG PV wire
Crimper and ferrules for the stranded wire going into screw clamps and the PV terminals
Checks battery and solar polarity and voltage before you turn anything on
Connect any solar panels to this system with this cable
One per string. Pick the DC1000V 30 Amp option. The 400V options are rated below the 500V strings on this system.
Order online
Hardware store or electrician
Do the cards in order. Keep every breaker and disconnect off until card 08. If a step is not clear, stop and ask on the DIY Solar Forum or hire a professional.
03
Connect the battery.
05
Wire the AC side.
07
Check the string voltage.
08
Start it up in order.
Set these on the SUNON12 touchscreen (Setting, then the menu listed) before you put a load on it. The Powland, EG4 12000XP and SUNGOLDPOWER use different menus, so follow their manuals.
| Menu | Item | Set it to |
|---|---|---|
| Battery | Battery Type | LF16 (lithium iron phosphate, 16 cells). The Yixiang 32kWh is a 16-cell pack. |
| Battery | BMS Select | CAN-BMS or 485-BMS, to match the battery port you plugged into. |
| Battery | BMS Protocol | The protocol Yixiang lists for RUiXU inverters. |
| EMS | Max Charge Current. Default is 60A, max 250A. | No higher than your battery allows. |
| EMS | Output source priority | Battery Mode runs loads from the battery first and uses the grid as backup. Grid Mode uses the grid first. |
| AC | N Line Ground | Match where your neutral is bonded. Disabled for a meter collar. Ask your electrician for Options A and B. |
You need two cables: one red, one black, both 2/0 AWG and the same length. Measure from the battery terminals to the inverter studs with the battery in its final spot, then add a little slack.
When a screw clamp lands on bare stranded wire it spreads the strands apart, some miss the clamp, and the connection can loosen and heat up over time. A ferrule turns the strands into one solid pin the clamp can grip. Use one on the stranded wire that goes into the SUNON12’s smaller clamps and terminals: the 6 AWG generator and smart load wires and the 10 AWG PV wire. The kit is in Step 04 above.
The SUNON12 has two solar inputs. Each one takes a string of panels wired in series, and each string has to land between 90V and 450V to charge.
To size a string, multiply the Voc on your panel’s label by the number of panels in it. Do not exceed 500VDC at the PV input.
The SUNON12 takes up to 12,000W of panels on each input, 24,000W total, with a 32A limit per input. The Powland takes 12,000W total: 6,000W and 22A per input, 500V max. The EG4 12000XP takes 24,000W at 120V to 385V, 480V max. The SUNGOLDPOWER takes 11,000W at 125V to 425V, 500V max.

In a long outage, a generator can recharge the battery. The SUNON12 has its own generator input (GEN L1 and L2 with a 63A built-in breaker), so the generator does not share the grid terminals.
On an inverter without a generator input, never connect the generator and the grid to AC IN at the same time.
| What you see | What to do |
|---|---|
| Blank screen | Turn on the battery breaker in the wiring box and the battery, then press the power button on the right side. |
| Fault 05, battery not connected | Check the battery cables and both battery breakers. |
| Fault 49, BMS communication error | Check the network cable, BMS Select and BMS Protocol. |
| Fault 10, battery output overload | Turn off loads until you are under 12,000W. |
| Fault 09, bypass overload | Turn off loads. The Load breaker passes up to 125A from the grid. |
| Fault 48, grid phase error | GRID (AC IN) must be 240V split phase: L1, L2 and neutral. |
| Fault 18, PV over-voltage | Open the PV disconnect. The string is over 500V. Remove panels from it. |
| Fault 02, battery under-voltage protection | Charge the battery from solar, the grid or a generator. |
The fault codes come from the SUNON12 manual. The Powland, EG4 12000XP and SUNGOLDPOWER use their own codes.
The Yixiang battery is not UL listed. As I say on my budget battery page, uncertified batteries carry some risk, because the company can change cells or BMS at any time. Ask your electrician, your inspector and your insurance company what they require before you order. For Option C, your utility decides whether a meter collar is allowed.
If you need a listed system, see my 48V UL certified batteries and the EG4 hybrid build.
The Yixiang 32kWh uses a JK 300A BMS. When the battery connects to a 12kW inverter, the inrush current into the inverter’s capacitors can trip the BMS overcurrent protection. The battery then cuts its output, and the inverter shuts off or shows Fault 05 (battery not connected). The BMS has to be reset and its settings changed before it will hold. Turning on Dis-limiter in the JK BMS app fixed it on my system.
JK BMS settings for this system
These start from Gobel Power’s JK settings sheet for EVE 314Ah cells, with the capacity and current limits changed for the Yixiang 32kWh and a 12kW inverter.
Reset the BMS after a trip
| Setting | Set it to | Why |
|---|---|---|
| Dis-limiter | On | Stops the inverter inrush from tripping the battery. |
| Charge, Discharge, Balance | On | Normal operation. |
| Disable Temp. Sensor, Emergency | Off | Both turn off protection. |
| Smart Sleep | Off | Keeps the BMS awake during long stretches on the grid. |
| Cell Count | 16 | 16 cells in series, 51.2V. |
| Battery Capacity (AH) | 628 | Sets the state of charge math. |
| Cell OVP / OVPR | 3.65V / 3.40V | Stops charging if a cell runs high. |
| Cell UVP / UVPR | 2.60V / 2.65V | Stops discharging if a cell runs low. |
| SOC-100% Volt. | 3.41V | Resets the gauge to 100% at full charge. |
| Vol. Cell RCV / RFV | 3.45V / 3.40V | Charge and float voltage sent to the inverter over CAN. |
| Continued Discharge Curr. | 300A | The BMS rating. A 12kW inverter pulls about 250A at full output. |
| Discharge OCP Delay / OCPR Time | 300s / 70s | Rides through motor starts; resets on its own after 70 seconds. |
| Continued Charge Curr. | 250A | The SUNON12 maximum. Set the inverter’s Max Charge Current at or below this. |
| Charge OCP Delay / OCPR Time | 3s / 60s | Gobel Power values. |
| Balance Trig. Volt. / Max Balance Cur. | 0.01V / 2.0A | Gobel Power values. |
| Charge UTP / UTPR | 2°C / 5°C | No charging below freezing. |
| Charge and Discharge OTP / OTPR | 60°C / 55°C | Gobel Power values. |
| CAN Protocol No. | The number Yixiang lists for RUiXU | Lets the inverter read the BMS. |
If the battery still trips after these changes, post your JK alarm list and settings screenshots on the DIY Solar Forum.
Visit my Channel